lesgreys signature
Planning5 min read

Product Backlog

Living document of upcoming work and improvements

January 15, 2025
productplanningbacklog

Overview

This is a living document tracking planned work, improvements, and features for upcoming sprints. Items are organized by priority and can be moved between states as work progresses.


🎯 Current Sprint

Data & Infrastructure

  • Migrate all writings into database

    • Move from MDX files to database storage
    • Maintain existing frontmatter structure
    • Ensure backward compatibility
  • Design a data schema for better context management and search

    • Create unified schema for writings, activities, and other content
    • Implement full-text search capabilities
    • Design relationships between different data types

User Experience

  • Mobile view improvements

    • Selecting an activity should be visible immediately (not scroll to end)
    • Improve touch interactions
    • Optimize layout for smaller screens
  • Add skeleton loading everywhere

    • Implement consistent loading states
    • Improve perceived performance
    • Reduce layout shift

System Improvements

  • Upgrade cron job syncing
    • Improve reliability and error handling
    • Add better monitoring and logging
    • Optimize sync performance

📝 Writing Section Enhancements

  • Design better header management in writing section

    • Add pill buttons for filtering
    • Implement instant routing
    • Improve navigation UX
  • Add case studies to writing

    • Include case studies in filter pills
    • Create unified content experience
    • Ensure proper categorization

🔌 Integrations

  • Finish the picture integrations using shortcuts

    • Complete Apple Shortcuts integration
    • Test end-to-end flow
    • Document usage
  • Create a better pipeline of Apple data

    • Health data (already in progress)
    • Notes integration
    • Other Apple ecosystem data sources
  • Include more work related data

    • Calendar integration
    • Email integration
    • Other productivity data sources

📊 Kanban States

Note: This document can be converted to a kanban board in the future. For now, items are organized by category.

To Do

All items listed above

In Progress

None currently

Done

Completed items will be moved here


Notes

  • This backlog is updated regularly as priorities shift
  • Items can be broken down into smaller tasks as needed
  • Consider dependencies when planning sprint work
  • Some items may span multiple sprints

Topics

#product#planning#backlog#roadmap